Austal USA Wins US Navy Contract for Construction of EPF 16
Austal USA announced today that it was awarded a $230.5 million contract for the detail design and construction of EPF 16, the Navy's newest Expeditionary Fast Transport (EPF) ship.
04 May 2022
Austal USA announced today that it was awarded a $230.5 million contract for the detail design and construction of EPF 16, the Navy's newest Expeditionary Fast Transport (EPF) ship.
12 Apr 2022
Austal USA showcased its new Expeditionary Fast Transport variant, known as EPF Flight-II, at the Sea Air Space 2022 defence exposition, held April 4-6 near Washington DC.
27 Jan 2022
Austal USA laid the keel of the future USNS Cody (EPF 14) with a ceremony held in the facilities in Mobile, Alabama on 27 January.
14 Nov 2021
Austal USA christened Expeditionary Fast Transport (EPF-13) USNS Apalachicola yesterday. Austal has delivered twelve EPFs since December 2012. USNS Apalachicola is slated for delivery this summer.
05 Sep 2021
Naval News asked the U.S. Navy for more information regarding the future replacements for the T-AH hospital ships and what the U.S. Navy intends to do for expanded expeditionary shipborne medical coverage.
09 Jun 2021
Austal USA has been awarded a US$44 million fixed-price, undefinitised contract modification for the design, procurement, production implementation and demonstration of autonomous capability on Expeditionary Fast Transport (EPF) 13, USNS Apalachicola.
01 Mar 2021
The U.S. Navy awarded Austal USA a $235 million undefinitized contract action modification on Feb. 26, 2021, for the detailed design and construction of EPF 15.
04 Oct 2020
The U.S. Navy has announced that USNS Burlington will carry out a proof-of-concept test: The EPF ship will serve as an afloat forward staging base style platform
03 Sep 2020
Austal Limited is pleased to announce that USNS Newport (EPF 12) has been delivered to the United States Navy from Austal USA's state-of-the-art shipyard in Mobile, Alabama.
04 Aug 2020
Austal USA and the U.S. Navy’s Expeditionary Fast Transport (EPF) program successfully completed integrated trials on the future USNS Newport (EPF 12), in the Gulf of Mexico. The ship is now ready to be delivered to the U.S. Navy.