Naval News Staff

GE Marine will provide gas turbine auxiliary equipment for the LM2500 engines that will power the Indian Navy’s new P17A frigates. This contract is with India-based Mazagon Dock Shipbuilders Limited (MDL) and Garden Reach Shipbuilders and Engineers Limited (GRSE), GE reported last week at the Aero India trade exhibition.
News

GE Marine lands additional order for Indian Navy new P17A frigates

GE Marine will provide gas turbine auxiliary equipment for the LM2500 engines that will power the Indian Navy’s new P17A frigates. This contract is with India-based Mazagon Dock Shipbuilders Limited (MDL) and Garden Reach Shipbuilders and Engineers Limited (GRSE), GE reported last week at the Aero India trade exhibition.

Read More
Construction on the future USS Canberra (LCS 30) began on Feb. 22 in Austal USA's module manufacturing facility. Dave Growden, native Australian, LCS Program Director and a 30-year member of Austal USA's team, had the honor of pushing the button to start the router that cut the first piece of aluminum, signalling start of construction for the 15th Independence-variant littoral combat ship.
News

Construction begins on US Navy’s future USS Canberra

Construction on the future USS Canberra (LCS 30) began on Feb. 22 in Austal USA’s module manufacturing facility. Dave Growden, native Australian, LCS Program Director and a 30-year member of Austal USA’s team, had the honor of pushing the button to start the router that cut the first piece of aluminum, signalling start of construction for the 15th Independence-variant littoral combat ship.

Read More
The future home of the UK’s P-8A Poseidon Maritime Patrol Aircraft is on target for completion, the Royal Air Force stated on Feb. 22, 2019. Once established the facility will hold up to three aircraft, along with maintenance facilities, planning rooms, and office space for the operators and support staff.
News

UK’s P-8A Maritime Patrol Aircraft facility on schedule

The future home of the UK’s P-8A Poseidon Maritime Patrol Aircraft is on target for completion, the Royal Air Force stated on Feb. 22, 2019. Once established the facility will hold up to three aircraft, along with maintenance facilities, planning rooms, and office space for the operators and support staff.

Read More
Royal Navy Tidesurge tanker has been welcomed to the fleet today with a dedication service at Greenock’s Ocean Terminal, the service announced on Feb. 20, 2019. The tanker is the latest of four new Royal Fleet Auxiliary ships acquired under the 450M£ (US$588M) MARS Tanker programme.
News

Royal Navy inducts new RFA Tidesurge tanker

Royal Navy Tidesurge tanker has been welcomed to the fleet today with a dedication service at Greenock’s Ocean Terminal, the service announced on Feb. 20, 2019. The tanker is the latest of four new Royal Fleet Auxiliary ships acquired under the 450M£ (US$588M) MARS Tanker programme.

Read More

Advertisement

Advertisement

Advertisement

Advertisement