Click here - to select or create a menu

Naval News

DEFEA 2023
  • News
  • Event News
    • DSEI Japan 2023
    • NAVDEX 2023
    • SNA 2023
    • Euronaval 2022
    • Indo Pacific 2022
  • Interviews
  • Videos
  • Advertising
  • About Us
  • Contact Us
Home» News»Wärtsilä solutions meet challenging needs of Canadian Coast Guard vessel
IMDEX Asia 2023
Wärtsilä solutions meet challenging needs of Canadian Coast Guard vessel
The CCGS Amundsen will be the only vessel in its class to be fitted with Retractable Thrusters and Dynamic Positioning. The solutions are being supplied by Wärtsilä. © Canadian Coast Guard

Wärtsilä solutions meet challenging needs of Canadian Coast Guard vessel

The technology group Wärtsilä has won a contract for the delivery and integration engineering of two Retractable Thrusters and a Dynamic Positioning (DP) system for the CCGS Amundsen, a Canadian Coast Guard (CCG) Icebreaker. The order with Wärtsilä was placed in July.

Xavier Vavasseur 24 Sep 2020

Wärtsilä press release

Wärtsilä was able to meet the CCG’s challenging requirements for build quality and fitting the equipment in the existing space of the 98 metres long Arctic Class 3 Medium Icebreaker, the only vessel in its class to be fitted with Retractable Thrusters and DP. The new Thrusters will be integrated with the existing Bow Thruster, which is also a Wärtsilä product.

“The Platinum DP system will exceed the functionality desired by the CCG, and will enhance the DP capacity of the vessel to perform sailing and manoeuvring operations. By offering the most intuitive user interface on the market, Platinum DP also reduces the training requirements for successful system operation. The user interface plays a critical role in helping operators make the most of the system in the trying conditions found in Canada’s Arctic waters,”



Mike Ford, Sales Manager for Americas & DP at Wärtsilä Voyage.

“We continue to work closely with the CCG to ensure that we fully understand and successfully meet their requirements for specification writing, documentation and project management. Supplying the products is only part of the picture, since they need to be engineered for complete integration with the Amundsen’s existing machinery, and for this we have outstanding capabilities,”



Ian Brouwer, Senior Sales Manager, Wärtsilä Marine Power.

The Wärtsilä equipment is scheduled for delivery in September 2021.

Propulsion System Royal Canadian Navy Wärtsilä 2020-09-24
Tags Propulsion System Royal Canadian Navy Wärtsilä
Facebook Twitter Stumble linkedin Pinterest More
SAS 2023

Authors

Posted by : Xavier Vavasseur
Xavier is based in Paris, France. He holds a Bachelor’s degree in Management Information Systems and a Master of Business Administration from Florida Institute of Technology (FIT). Xavier has been covering naval defense topics for nearly a decade.

Related Articles

STADT Inks Design and Delivery Contract with NATO Country

STADT Inks Design and Delivery Contract with NATO Country

Naval News Staff 20 Jan 2023
STADT NAVAL has signed a contract to design and supply complete electric propulsion solutions for series of new naval ships for a NATO country.
STADT NAVAL and Norwegian MoD Strengthen their Cooperation

STADT NAVAL and Norwegian MoD Strengthen their Cooperation

Naval News Staff 19 Dec 2022
STADT NAVAL and the Norwegian Ministry of Defence have agreed to strenghten their cooperation related to the use of STADT's green and noise-free electric propulsion technology in naval ship programs...
Kraken Wins Royal Canadian Navy Contract for Minehunting Program

Kraken Wins Royal Canadian Navy Contract for Minehunting Program

Naval News Staff 07 Dec 2022
Kraken has been awarded a prime contract with the Government of Canada to provide Remote Minehunting and Disposal Systems (RMDS) for the Department of National Defense (DND).

Advertisement

Advertisement

Legal / Privacy Policy
About Us
Contact Us

Copyright © 2022 Naval News
All Rights Reserved
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.Ok