Click here - to select or create a menu

Naval News

DEFEA 2023
  • News
  • Event News
    • DSEI Japan 2023
    • NAVDEX 2023
    • SNA 2023
    • Euronaval 2022
    • Indo Pacific 2022
  • Interviews
  • Videos
  • Advertising
  • About Us
  • Contact Us
Home» News»Vigor launches MSV(L) prototype for the U.S. Army
IMDEX Asia 2023
Vigor launches MSV(L) prototype for the U.S. Army
The MSV(L) will replace the Landing Craft Mechanized-8, (LCM-8,) a Vietnam-era watercraft. It is the first major Army watercraft acquisition in more than 20 years. The current Army Acquisition Objective is to build 13 vessels. The MSV(L) is 117 feet long and can travel up to 21 knots fully laden and 30 knots unladen. Its range will be 360 nautical miles when fully laden. Eight Army Mariners will crew the MSV(L). Each vessel’s payload will be 82 short tons. (U.S. Army photo)

Vigor launches MSV(L) prototype for the U.S. Army

The U.S. Army’s Maneuver Support Vessel (Light), or MSV(L), prototype was launched Oct. 10 at the Vigor, LLC marine fabrication facility in Vancouver. The launch is significant, as the MSV(L) represents the first of a new class of U.S. Army Watercraft.

Naval News Staff 15 Oct 2022

U.S. Army press release

The MSV(L) will replace the Landing Craft Mechanized-8, (LCM-8,) a Vietnam-era watercraft that is unable to transport some of today’s equipment due to the weight of modern combat vehicles. MSV(L) is a modernized landing craft that will improve the speed and effectiveness of the Army’s dynamic force repositioning.

The MSV(L) features increased payload capability; providing access within the Maritime Domain; increased speed and maneuverability to move the Army faster; and improved draft for greater geographical access.

“Launching the MSV(L) prototype, a brand-new, first-in-class vessel is a major achievement for us to celebrate. Not only does this prototype represent the first of its kind for the Army as a digital vessel, but also, the overall team has surmounted several hurdles having to do with COVID-19-related workforce and supply-chain issues. I couldn’t be more proud of this partnership to become one step closer to providing Army Mariners the world over a truly modernized capability.”


Col. Beth Behn, the U.S. Army’s Chief of Transportation
Vigor launches MSV(L) prototype for the U.S. Army
MSV(L) prototype before launching (U.S. Army photo)

“The MSV(L) represents the first new major watercraft system acquisition in more than 20 years representing the U.S. Army’s commitment to Army Watercraft modernization. Our Product Manager, Army Watercraft Systems, has worked very closely with our Army enterprise partners and Vigor to ensure a successful launch. The team has done an outstanding job working through some fairly significant schedule challenges in order to get to where we are today. This launch is the direct result of the collaborative work between many dedicated professionals from both the Army and Vigor.”


Brig. Gen. Samuel L. (Luke) Peterson, the U.S. Army’s Program Executive Officer for Combat Support and Combat Support (PEO CS&CSS.)

The Army awarded Vigor in late 2017 a 10-year contract for the development and production of up to 36 of the new watercraft. In September 2019, Vigor and the Army laid the keel in a ceremony also held in Vancouver. The current Army Acquisition Objective is to build 13 vessels, according to Wolfgang Petermann, project manager, Transportation Systems, PEO CS&CSS. The Army’s strategy for the MSV(L) has centered on integrating mature commercial off-the-shelf subsystems into a new hull form, which takes advantage of the marine industry design innovation and competition, he added.

Army watercraft enables commanders to transport and sustain combat-configured equipment with personnel, vehicles and sustainment cargo, through fixed, degraded and austere ports, inland waterways, remote and unimproved beaches and coastlines for missions across the spectrum of military operations. The improved maneuverability and increased speed capability that the MSV(L) brings to bear will provide a better watercraft for operating in inter-coastal areas, rivers and inland waterways, and in anti-access/area-denial environments.

Vigor launches MSV(L) prototype for the U.S. Army
MSV(L) prototype while being launched (U.S. Army photo)

The length of MSV(L) is 117 feet. It will have a speed of 21 knots fully laden and 30 knots unladen. Its range will be 360 nautical miles when fully laden. Eight Army Mariners will crew the MSV(L).

Each vessel’s payload will be 82 short tons, which means it can haul one combat configured M1 Abrams tank, or two Stryker combat vehicles, or four Joint Light Tactical Vehicles, as well as multiple other payload configurations.

MSV(L) now enters builder’s trials, which are designed to finalize Vigor’s fabrication and commissioning activities. Builder’s trials are slated for completion in November. They will be followed by extended acceptance trials, led by the Army’s Product Manager, Army Watercraft Systems and the Army Test and Evaluation Command, to verify that the watercraft meets its intended requirements.

A low-rate initial production decision on the Maneuver Support Vessel (Light) is targeted for early 2023. The prototype is slated for delivery to the Army Mariner community headquartered at Joint Base Langley-Eustis in early 2024.

PEO CS&CSS is one of 12 Army Program Executive Offices reporting to the Assistant Secretary of the Army (Acquisition, Logistics & Technology.) Its military and Army civilian acquisition professionals are charged with the lifecycle management for the majority of the Army’s Engineer, Ordnance, Quartermaster, and Transportation systems, which account for roughly 20 percent of all the equipment the Army’s Active, Reserve and National Guard components use.

– End –

You can read Naval News’ interview with Vigor and the U.S. Army regarding MSV(L) from the link below:

Despite Setback, U.S. Army Forges Ahead with Maneuver Support Vessel (Light)
MSV(L) Vigor 2022-10-15
Tags MSV(L) Vigor
Facebook Twitter Stumble linkedin Pinterest More
DSEI Japan

Related Articles

Despite Setback, U.S. Army Forges Ahead with Maneuver Support Vessel (Light)

Despite Setback, U.S. Army Forges Ahead with Maneuver Support Vessel (Light)

Peter Ong 06 Apr 2022
The U.S. Army’s LCM-8 has been in service since 1959 and has a payload capacity ...
Vigor Wins U.S. Navy Availability Contract for Independence-class LCS

Vigor Wins U.S. Navy Availability Contract for Independence-class LCS

Naval News Staff 20 May 2021
The U.S. Navy has awarded Vigor, a Titan Company, a docking selected restricted availability (DSRA) contract for both USS Gabrielle Giffords (LCS 10) and USS Omaha (LCS 12).
Vigor Laid Keel of U.S. Army Next Gen Landing Craft MSV(L)

Vigor Laid Keel of U.S. Army Next Gen Landing Craft MSV(L)

Xavier Vavasseur 21 Sep 2019
Representatives from the U.S. Army and federal and local elected officials joined Vigor employees for a keel laying ceremony yesterday, celebrating the first milestone in the construction of the Army’s next generation landing craft, the Maneuver Support Vessel (Light) or MSV(L).

Advertisement

Advertisement

Legal / Privacy Policy
About Us
Contact Us

Copyright © 2022 Naval News
All Rights Reserved