General Dynamics press release
On March 27, 2023, General Dynamics NASSCO started construction on the future USNS Sojourner Truth (T-AO 210), the sixth ship for the U.S. Navy’s John Lewis-class fleet oiler program.
Gwen Phillips, a Production Support Specialist II with 34 years as part of the NASSCO team, served as the honoree for the ceremony and initiated the first cut of steel that will be used to construct the vessel.
“Thank you to our honoree, the Navy and our dedicated shipbuilders for helping create this historic day!”
Gwen Phillips, Production Support Specialist at NASSCO
John Lewis-class main characteristics
Type | Fleet replenishment oiler |
Displacement | 49,850 tons full load |
Length | 746 ft (227.4 m) |
Beam | 106 ft 5 in (32.4 m) |
Draft | 33.5 ft (10.2 m) maximum |
Propulsion | Two medium-speed Fairbanks-Morse MAN 12V48/60CR diesel engines, two shafts, propellers |
Speed | 20 knots (37 km/h; 23 mph) |
Endurance | 6,147 nmi (11,384 km; 7,074 mi) |
Complement | 125 total |
Electronic warfare & decoys | AN/SLQ-25A Nixie torpedo countermeasures |
Armament | Multiple .50 caliber machine guns. Space, weight, and power reservations for Phalanx or SeaRAM CIWS |
Aviation facilities | Helicopter flight deck |
UNREP capabilities: | 5 refueling stations 2 dry cargo transfer rigs |