Senate appropriators have unveiled their reconciliation-free $1.1 trillion Pentagon budget with a number of budget overhauls, including a near-total rejection of the Navy’s prized 34,000 ton guided missile battleship, dealing a major setback to one of the Trump administration’s most ambitious shipbuilding initiatives.
Senate appropriators are moving to strip nearly $1.84 billion in funding for the U.S. Navy’s planned BBG(X) guided-missile battleship, rejecting much of the service’s proposed investment in the massive new surface combatant as part of a sweeping overhaul of the Pentagon’s fiscal 2027 budget that aimed to fold in initiatives proposed in the White House’s sweeping reconciliation request — a form of funding separate from the base Pentagon budget.
The proposed cuts, outlined in the Senate Appropriations Committee’s defense spending bill released Nov. 16, would eliminate the Navy’s entire $1 billion request for advance procurement of the battleship, while removing another $836.9 million from research and development accounts associated with the program.
The committee described the $1 billion advance procurement request as “early to need,” signaling that lawmakers do not believe the Navy is sufficiently far along in the program to justify the expenditure in fiscal 2027.
The battleship program was formally announced in December 2025.
The reductions represent one of the most significant congressional challenges yet to the Trump administration’s plans to revive the battleship as a centerpiece of its future surface fleet, less than a year after the White House announced the new warship program in December 2025. The ship serves as a centerpiece of the Golden Fleet initiative championed by the White House and former Secretary of the Navy John Phelan. The U.S. Navy’s Golden Fleet website has been “under construction” since mid-January after being launched to showcase the new battleship.
The BBG(X), envisioned as a roughly 34,000-ton guided-missile warship, would be the largest American surface combatant built since World War II if built. It would also be the first new class of battleship procured by the Navy in more than eight decades. The proposed vessel would be substantially larger than the Navy’s existing Arleigh Burke-class destroyers and Zumwalt-class destroyers, with the ability to accommodate a much larger weapons payload and advanced combat systems.
According to the Senate appropriation committee’s accompanying explanatory statement, the proposal eliminates $585.9 million associated with BBG(X) from the Navy’s ship preliminary design and feasibility studies account, along with another $251 million from advanced surface machinery systems.
“While the Committee has long supported efforts to increase both the size of the United States Navy’s fleet and the scale and pace of the United States shipbuilding industrial base, the Committee has significant concerns regarding the extent to which the President’s budget request reflects effective investments towards these ends,” the report states.
The committee specifically identified more than $6.2 billion requested to accelerate the procurement of six ships and support vessels that it determined were already substantially ahead of their established construction schedules, arguing that the additional funding was unlikely to be effectively spent during fiscal 2027.
The Senate proposal is not final, but the proposed elimination of nearly $1.84 billion in battleship funding still marks a substantial congressional rebuke of the administration’s plans.