Bath Iron Works laid keel of future USS Carl M. Levin (DDG 120)
DDG 120 will be built in the Flight IIA configuration with the Aegis Baseline 9 Combat System which includes Integrated Air and Missile Defense capability. This system delivers quick reaction time, high firepower, and increased electronic countermeasures capability for Anti-Air Warfare. Delivery to the fleet is planned for Fiscal Year 2021.