
Watch IAI Testing LORA Ballistic Missile at Sea
IAI has successfully completed an operational dual firing trial with the LORA Weapon System. The trial was held in the open sea to demonstrate LORA’s capabilities to an IAI customer

IAI has successfully completed an operational dual firing trial with the LORA Weapon System. The trial was held in the open sea to demonstrate LORA’s capabilities to an IAI customer

Leading davit supplier Vestdavit has completed the delivery of four boat-handling systems to Australian shipyard Austal.

The Japanese Ministry of Defense (MoD) ordered two 4,900 tons Yard Oiler Tankers (YOT) from local shipbuilder Shin Kurushima (株式会社新来島どっく) on May 19 2020.

Taiwan’s Coast Guard Administration (CGA) held a ship launching and christening ceremony today, at the Taiwan Shipbuilding Corporation (CSBC). The 4,000-ton patrol ship “Chiayi” (CG-5001) is the largest vessel ever launched for Taiwan’s CGA.

French Minister of the Armed Forces, Florence Parly, visited the French Navy (Marine Nationale) naval base of Brest on May 29. She witnessed the future mine warfare system and presented the advances of the franco-british maritime mine countermeaseure (MMCM) programme.

China’s first domestically built aircraft carrier, “Shandong” (pennant number 17), departed the Dalian Shipyard on May 25 for sea trials in the northern region of the Yellow Sea.

GeoSpectrum Technologies announces that it was selected to deliver its Long-Range Acoustic Messaging (LRAM) system to another Western customer. This follows a recent successful delivery of LRAM equipment to the Canadian Government.

Raytheon Missiles & Defense completed comprehensive near-field range testing on the first AN/SPY-6(V)1 radar array, signaling its readiness to be wrapped, packed and shipped to the U.S. Navy’s future USS Jack H. Lucas, DDG-125.

Babcock, the Aerospace and Defence company, has been awarded a multimillion pound contract extension to manufacture a further 18 tactical Missile Tube Assemblies (MTAs) for General Dynamics Electric Boat (GDEB).

The Coast Guard accepted delivery of the 39th fast response cutter (FRC), Myrtle Hazard, in Key West, Florida, May 28.