Click here - to select or create a menu

Naval News

DSEI Japan 2023
  • News
  • Event News
    • SNA 2023
    • Euronaval 2022
    • Indo Pacific 2022
    • Sea Air Space 2022
    • DIMDEX 2022
  • Interviews
  • Videos
  • Advertising
  • About Us
  • Contact Us
Home» News»India’s Naval LCA Prototype Completes Launch and Recovery in a Single Sortie

India’s Naval LCA Prototype Completes Launch and Recovery in a Single Sortie

On 29 September, 2019, LCA Naval Prototype-2 launched off the ski jump at 1621 hours and then subsequently “trapped” at 1631 hrs on the arresting gear site

Xavier Vavasseur 01 Oct 2019

Indian MoD press release

The event took place at the Shore Based Test Facility INS Hansa, Goa). While both these activities had been achieved individually earlier, this was the first occasion when the complete cycle of launch and recovery necessary for aircraft carrier operations was accomplished in a single sortie. 

Being a pioneering technology acquisition and demonstration program for the unique Short Take-Off but Arrested Recovery (STOBAR) concept of aircraft operations, the LCA (Navy) team has had to conceptualise and experiment with complex software modes from a clean slate. All this had to be done while tentatively exploring and incrementally expanding the structural capabilities of the aircraft to withstand the brutal requirements of carrier operations. The exploratory nature of this stage of the programme necessitates experimentation with multiple software options and hardware configurations. These include multiple configurations of aerodynamic surfaces, different flight control strategies, avionics tools and display symbols to ease the piloting task, multiple iterations to the “mechanicals” (dampers/structural members/contact points) etc.

A milestone event towards development of an indigenous Deck Based Fighter aircraft was achieved today with the first ever arrested landing on the Shore Based Testing Facility at the Naval Air Station at Goa, by LCA (Navy) aircraft flown by Cmde JA Maolankar. @SpokespersonMoD pic.twitter.com/iPdObV2tXD

— SpokespersonNavy (@indiannavy) September 13, 2019
Video of LCA’s first arrested landing on Sept. 13

Comprehensive and seamless integration of all these experimental variants simultaneously into a single platform is therefore not possible till all options have been evaluated and the preferred configuration has been decided. The events on September 29, 2019, therefore, demonstrate the completion of the basic exploration phase of the programme and transition to refinement and improvement iterations.

Raksha Mantri Shri Rajnath Singh has congratulated DRDO, ADA, HAL and Indian Navy for this major feat. Secretary, Department of Defence, R&D and Chairman DRDO Dr. G Satheesh Reddy also congratulated DRDO, ADA, HAL and Indian Navy for the achievement.

India Indian Navy LCA Naval Aviation 2019-10-01
Tags India Indian Navy LCA Naval Aviation
Facebook Twitter Stumble linkedin Pinterest More

Authors

Posted by : Xavier Vavasseur
Xavier is based in Paris, France. He holds a Bachelor’s degree in Management Information Systems and a Master of Business Administration from Florida Institute of Technology (FIT). Xavier has been covering naval defense topics for nearly a decade.

Related Articles

India’s LCA Navy and MIG-29K Trap aboard New Aircraft Carrier Vikrant

India’s LCA Navy and MIG-29K Trap aboard New Aircraft Carrier Vikrant

Naval News Staff 06 Feb 2023
The Indian Ministry of Defense announced the maiden landing of an LCA Navy and MIG-29K fighters aboard the Indian Navy's new aircraft carrier INS Vikrant.
Indian Navy Commissions 5th Scorpene Submarine INS Vagir

Indian Navy Commissions 5th Scorpene Submarine INS Vagir

Xavier Vavasseur 23 Jan 2023
The Indian Navy today commissioned INS Vagir, its fifth Scorpene type submarine (Kalvari-class)...
France and India Kick Off VARUNA 2023 Naval Exercise

France and India Kick Off VARUNA 2023 Naval Exercise

Naval News Staff 17 Jan 2023
The 21st Edition of the Bilateral Naval Exercise between India and France – Exercise VARUNA commenced on the Western Seaboard today, 16 Jan 2023.

Advertisement

Advertisement

Legal / Privacy Policy
About Us
Contact Us

Copyright © 2022 Naval News
All Rights Reserved