Search Results for: PLA Navy – Page 585

UK P-8A Poseidon Crews Started Training in Florida
News

UK P-8A Poseidon Crews Started Training in Florida

Royal Air Force personnel from Number 120 Squadron and Poseidon Line Squadron have started training on the P-8A Poseidon Maritime Patrol Aircraft (MPA) at Naval Air Station Jacksonville, Florida. The RAF designation of the aircraft will be Poseidon MRA Mk1.

Read More
The Bell Boeing Joint Program Office has been awarded an estimated $143,863,184 firm-fixed-price requirements contract for performance-based logistics and engineering support for the V-22 platform. This is an 11-month base contract with four one-year option periods.
News

Bell Boeing lands US$144M order for V-22 support

The Bell Boeing Joint Program Office has been awarded an estimated $143,863,184 firm-fixed-price requirements contract for performance-based logistics and engineering support for the V-22 platform. This is an 11-month base contract with four one-year option periods.

Read More
Naval News spent two days with Belgium Naval & Robotics, a consortium formed by Naval Group and ECA Group to answer the Dutch and Belgian Navies’ joint Mine Countermeasures program (MCM). From stem to stern, let’s discover how this joint venture (called a « combination » by the Belgian military) has built an innovative and strategic offer covering all Belgian requests, and more…
News

How Belgium Naval & Robotics will Remodel Naval Mine Warfare

Naval News spent two days with Belgium Naval & Robotics, a consortium formed by Naval Group and ECA Group to answer the Dutch and Belgian Navies’ joint Mine Countermeasures program (MCM). From stem to stern, let’s discover how this joint venture (called a « combination » by the Belgian military) has built an innovative and strategic offer covering all Belgian requests, and more…

Read More
On 15th. January, Navantia has initiated, in San Fernando shipyard, the construction of the first corvette for the Saudi Arabia Navy. The event has consisted of the cut of the first plate of the ship, belonging to the block 401, dimensions of 12 x 2,4 meters, a thickness of 7 millimeters and a weight of 1.254 kilos.
News

Navantia starts building first corvette for Saudi Arabia

On 15th. January, Navantia has initiated, in San Fernando shipyard, the construction of the first corvette for the Saudi Arabia Navy. The event has consisted of the cut of the first plate of the ship, belonging to the block 401, dimensions of 12 x 2,4 meters, a thickness of 7 millimeters and a weight of 1.254 kilos.

Read More
The US Navy’s newest aircraft carrier, USS Gerald R. Ford (CVN 78), closed out 2018 on a high note with the acceptance of the ship’s first advanced weapons elevator (AWE), setting the tone for more positive developments in the year ahead, the Carrier's Public Affairs said on January 16.
News

USS Gerald R. Ford gets first advanced weapons elevator

The US Navy’s newest aircraft carrier, USS Gerald R. Ford (CVN 78), closed out 2018 on a high note with the acceptance of the ship’s first advanced weapons elevator (AWE), setting the tone for more positive developments in the year ahead, the Carrier’s Public Affairs said on January 16.

Read More

Advertisement

Advertisement

Advertisement

Advertisement