
USCG Cutter Healy suffers fire, propulsion failure en route to Arctic
The U.S. Coast Guard Cutter Healy (WAGB-20) suffered a fire in one of the ship’s main propulsion motors Aug. 18 while underway for operations in the Arctic.

The U.S. Coast Guard Cutter Healy (WAGB-20) suffered a fire in one of the ship’s main propulsion motors Aug. 18 while underway for operations in the Arctic.
GE press release GE’s Integrated Full Electrical Power and Propulsion System (IFEP) for the AOPS vessels includes rugged induction propulsion motors, variable frequency drive converters

Russia’s Vyborg Shipyard held a keel laying ceremony on 25 July for the “Purga” ice-class coast guard ship of project 23550, the enterprise said. The vessel is intended for the border guard service of the Federal Security Service (FSB) of the Russian Federation.
Zvezda Shipyard in Bolshoi Kamen in the Far East began to cut metal for the first Leader-class nuclear icebreaker of project 10510. It has been ordered by Rosatom nuclear corporation, the Atomflot Company said.

The Arktika lead nuclear icebreaker of project 22220 sailed out from Baltic Shipyard for the final stage of sea trials, the enterprise said.

According to a memo published by the White House and signed by President Trump, new nuclear-powered ice-breakers could be procured for the United States Coast Guard (USCG) to replace those currently in service and to keep an active presence in Arctic and Antarctic regions.

On April 23, Rosatom subsidiary FSUE Atomflot and shipbuilder Zvezda LLC remotely signed a contract on the construction of the nuclear icebreaker Leader (project 10510).

Four U.S. Navy ships and a Royal Navy ship entered the Barents Sea, working together to conduct maritime security operations in the challenging environmental conditions above the Arctic Circle, May 4, 2020.

The missile division of the Russian Northern Fleet equipped with K-300P Bastion (NATO reporting name SS-C-5 Stooge) mobile coastal defence missile system passed their winter training course in the Arctic, the Northern Fleet said on April 24, 2020.

On November 23, 2019, the shipbuilders at Halifax Shipyard completed a successful Builder’s Sea Trial on the future HMCS Harry DeWolf, Canada’s lead Arctic and Offshore Patrol Ship (AOPS).