TRS-4D Radar & Mirador MK2 EO Systems for German K130 Batch 2 Corvettes
The German defense procurement agency (Bundesamt für Ausrüstung, Informationstechnik und Nutzung der Bundeswehr; BAAINBw) selected ...
06 Feb 2019
The German defense procurement agency (Bundesamt für Ausrüstung, Informationstechnik und Nutzung der Bundeswehr; BAAINBw) selected ...
06 Feb 2019
The French Navy (Marine Nationale) announced that aircraft carrier Charles de Gaulle and its strike group set sails on February 3rd to participate in a large-scale combined exercise dubbed FANAL19. The goal of FANAL19 is to achieve a high level of operational readiness and interoperability within an allied naval force.
06 Feb 2019
The Royal Norwegian Navy's future logistics support vessel HNoMS Maud departed DSME shipyard in South Korea. The vessel will be fully operational by 2020.
03 Feb 2019
The first of three Estonian Navy (Eesti Merevägi) mine countermeasure (MCM) vessels has just recieved a capability upgrade at Babcock’s Rosyth facilities in Fife.
03 Feb 2019
USS South Dakota (SSN 790) became the newest and 17th Virginia-class fast-attack submarine in the U.S. Navy during her commissioning ceremony at Naval Submarine Base New London, February 2, 2019.
02 Feb 2019
DDG 120 will be built in the Flight IIA configuration with the Aegis Baseline 9 Combat System which includes Integrated Air and Missile Defense capability. This system delivers quick reaction time, high firepower, and increased electronic countermeasures capability for Anti-Air Warfare. Delivery to the fleet is planned for Fiscal Year 2021.
01 Feb 2019
Chantiers de l'Atlantique and Naval Group were notified yesterday of an order for four Logistic Support Ships (LSS). Previously known as FLOTLOG (for Flotte Logistique), the BRF (bâtiments ravitailleurs de force or force replenishment vessel) contract is valued at 1.7 Billion Euros. The design of the French BRF is based on the Italian LSS (Vulcano-class)
01 Feb 2019
The U.S. Navy has awarded a contract for the construction of CVN 80 and CVN 81 to Huntington Ingalls Industries (HII) Newport News Shipbuilding.
31 Jan 2019
Boeing was awarded $15,9 million for modification P00001 to delivery order previously placed against basic ordering agreement N00019-16-G-0001. This modification exercises an option for the procurement of 79 Harpoon Block II Plus Tactical Missile upgrade kits for the U.S. Navy.
31 Jan 2019
As part of the tender process for the introduction of the new Type 31e frigate generation, thyssenkrupp Marine Systems is one of the selected suppliers in the final design and offer phase in a consortium led by ATLAS ELEKTRONIK UK including ATLAS ELEKTRONIK GmbH and with British shipyards Harland & Wolff and Ferguson Marine Engineering. This was announced by the Royal Navy in London in December 2018.