
Austal USA Cut 1st Aluminum for U.S. Navy’s 13th EPF
The first cut of metal for the future USNS Apalachicola (T-EPF 13) took place on August 19, 2019 at the Austal USA shipyard in Mobile, Alabama.

The first cut of metal for the future USNS Apalachicola (T-EPF 13) took place on August 19, 2019 at the Austal USA shipyard in Mobile, Alabama.

USNS Puerto Rico (EPF 11), successfully completed the first integrated sea trials for an Expeditionary Fast Transport (EPF) ship Aug. 22. The ship returned to the Austal USA shipyard following two days underway in the Gulf of Mexico.

Hensoldt has successfully installed the first two of its TRS-4D naval radars aboard the U.S. Navy’s “Freedom” Variant Littoral Combat Ships (LCS), the company announced on August 22.

In a recent announcement, the UK Ministry of Defence Torpedoes, Tomahawk and Harpoon (TTH) Project Team further detailed its requirement to implement an interim surface to surface guided weapon to replace the existing Harpoon missile.

The UK and Norway reinforced their commitment for joint anti-submarine operations in the North Atlantic at RAF Lossiemouth in North-East Scotland today.

BAE Systems cut the first steel for HMS Cardiff, the second Type 26 City-class frigate for the Royal Navy, on August 14 2019.

The Navy is looking at “something beyond even a Flight III” combat capability for its new-build destroyers, as its plans for transitioning from building the Arleigh Burke-class destroyer to the future Large Surface Combatant continue to evolve and the LSC procurement date continues to slide.

The Canadian Coast Guard will be procuring six new program icebreakers to replace its current ageing fleet of icebreakers.

The unmanned surface vessel of the SLAMF/MMCM program carried out a demonstration of its capabilities in Brest harbor in June 2019. Testing with teams from the French Navy, French Armament General Directorate (DGA) and Thales is ongoing while qualification for the whole system (USV + payload) is set for December this year.

Bollinger Shipyards has delivered the USCGC ANGELA MCSHAN, the 35th Fast Response Cutter (FRC) to the U.S. Coast Guard. The Coast Guard took delivery on the 1st of August, 2019 in Key West, Florida.