US Navy

The U.S. Navy held a keel laying and authentication ceremony for its twelfth Expeditionary Fast Transport (EPF) vessel, Newport (EPF 12), at Austal USA’s shipyard., Jan. 29. The keel was said to be “truly and fairly laid” as it was authenticated by Charlotte Dorrance Marshall, signing her initials into the keel plate.
News

US Navy held 12th EPF Vessel keel laying ceremony

The U.S. Navy held a keel laying and authentication ceremony for its twelfth Expeditionary Fast Transport (EPF) vessel, Newport (EPF 12), at Austal USA’s shipyard., Jan. 29. The keel was said to be “truly and fairly laid” as it was authenticated by Charlotte Dorrance Marshall, signing her initials into the keel plate.

Read More
Northrop Grumman Corporation has received authorization to proceed with low rate initial production of Surface Electronic Warfare Improvement Program (SEWIP) Block 3 systems following a successful Milestone C decision for the SEWIP Block 3 AN/SLQ-32(V)7 program.
News

Northrop to proceed with SEWIP Block 3 upgrade LRIP

Northrop Grumman Corporation has received authorization to proceed with low rate initial production of Surface Electronic Warfare Improvement Program (SEWIP) Block 3 systems following a successful Milestone C decision for the SEWIP Block 3 AN/SLQ-32(V)7 program.

Read More
The Bell Boeing Joint Program Office has been awarded an estimated $143,863,184 firm-fixed-price requirements contract for performance-based logistics and engineering support for the V-22 platform. This is an 11-month base contract with four one-year option periods.
News

Bell Boeing lands US$144M order for V-22 support

The Bell Boeing Joint Program Office has been awarded an estimated $143,863,184 firm-fixed-price requirements contract for performance-based logistics and engineering support for the V-22 platform. This is an 11-month base contract with four one-year option periods.

Read More

Advertisement

Advertisement

Advertisement